PROJECT: VA38 | |||
Modules | Project Size | Scope of Work | Steel Used |
120,000 | 500 acres | EPC | 2,200,000 lbs |
System Size | Location | Local Hires | Veteran Hires |
25 MWDC | Cherrydale, VA | 93% | 15% |
PROJECT: VA38 | |||
Modules | Project Size | Scope of Work | Steel Used |
120,000 | 500 acres | EPC | 2,200,000 lbs |
System Size | Location | Local Hires | Veteran Hires |
25 MWDC | Cherrydale, VA | 93% | 15% |